Electrical Power System


The electrical power system has three eneloop batteries; which enable the satellite to keep operation in orbit.
Five GOMSPACE solar panels are installed around the satellite from five sides, while one side has camera.
The EPS is connected to the OBC through special stack-through connector for power line enable and receiving telemetry signals. The ESP does not have any logic inside, while all logical operation is done by the OBC. ESP provides 3.3 V, and 5 Volt tot eh subsystems.
Two Separation-switch interface with latching mechanism One Remove-Before-Flight-pin interface for power isolation